Power Disconnection and Reconnection Liverpool
Supply isolated safely at the network side for demolishers, roofers and builders, then reconnected and certified.
Your main switch only turns off the circuits inside. The service line, raiser and mains stay live, so anyone working near them, or demolishing the house, needs the supply isolated at the network side. Across the Liverpool area, with rebuilds, re-roofs, renovations and acreage works, power disconnection and reconnection is constant work for us.
Demolitions and knockdown rebuilds
Older homes near the city centre, in Warwick Farm, Chipping Norton and Moorebank are being replaced with new homes and duplexes. Before demolition the supply is permanently disconnected and the service removed. We usually set up a temporary builders supply on the same visit.
Re-roofs
Tiled roofs on 1980s and 90s estate homes are being replaced with metal across Casula, Green Valley and Hinchinbrook. The roofer works around the raiser, so the supply is isolated for the days they need. If the raiser is rusted, we replace it at reconnection with a point of attachment upgrade.
Renovations, extensions and granny flats
Extensions can move the meter board. Second storeys usually move the attachment point. Granny flats sometimes need the main supply isolated while sub-mains are connected. We fit around the builder.
Switchboard upgrades
When your electrician replaces the board, the supply has to be isolated. We book the same day for one outage.
Acreage and sheds
On rural properties, isolating can involve private poles and long lines. Isolating at the first private pole can make the whole private line safe at once for works further in.
Temporary or permanent
Temporary is for work that ends with the house back on. Permanent is for demolition: the service is removed and the meter taken out. Tell us which you need when you book.
On the day
We confirm the plan with the trades, isolate at the right point, and make sure the supply can’t be re-energised by accident. On reconnection day we check the raiser, mains and clearances, then reconnect, test and certify.
Hot weather
In summer we schedule disconnections early and keep them short. If anyone at home relies on powered medical equipment, tell us when booking.
Paperwork
We lodge the Endeavour Energy notification and can give builders and roofers written confirmation of the isolation.
Where we work
Disconnection bookings come from across the area, including rebuilds in level 2 electrician Warwick Farm and Chipping Norton.
Which point we isolate at
On overhead streets we usually isolate at the street pole or the point of attachment. On underground streets, at the boundary pit. On acreage, isolating at the first private pole can make the whole private line safe at once. We choose the point that keeps the work area safe and leaves as little switched off as possible.
Tenanted homes
Landlords and property managers book isolations for re-roofs and repairs on rentals. We give a clear time window to pass on to tenants and keep the outage short.
Re-energising
Before we reconnect, we check that the raiser, mains and meter board haven’t been damaged by the work, that clearances still meet the rules, and that your electrician has finished inside.
Granny flat connections
When a granny flat’s sub-mains are connected to the main switchboard, your electrician may need the house supply isolated at the network side. We book it for the same morning, so the outage covers the connection and nothing more. If the main supply is being upgraded at the same time, both happen in one visit.
Several lots, one builder
Builders working in Edmondson Park, Austral or across a street of rebuilds can send us a lot list. We’ll schedule disconnections, site power and final connections as one program.
Written confirmation
Roofers and builders often need proof the supply is isolated for their safety records. We provide it in writing on the day.
Book it
Call the level 2 electrician Liverpool team with your dates. If something is unsafe now, call our emergency level 2 electrician number.
Updated
What good power disconnection and reconnection looks like
Power Disconnection and Reconnection across Liverpool
Power Disconnection and Reconnection in Liverpool: step by step
- Agree datesBooked to your builder, demolisher or roofer's program.
- Lodge with EndeavourNotification lodged before work starts.
- IsolateSupply made safe at the pole, pit or private pole.
- Restore or removeReconnected and tested, or removed for demolition.
Power Disconnection and Reconnection guides for Liverpool homeowners
Power Disconnection and Reconnection questions in Liverpool
Something else on your mind? Call 02 9158 9916 and ask.
When should we book the disconnection for our knockdown?
A week or two before demolition. Site power usually goes in the same day.
Does a re-roof need the power off?
If the roofer is near the raiser or service line, yes.
Can you disconnect a shed on acreage?
Yes, including private lines and poles.